NTPC Enlisting EPC Vendors for Floating & Ground Mounted Solar Projects

Sep 4, 2020 01:08 PM ET
  • NTPC Ltd has actually provided an NIA for the enlistment of EPC Vendors for the advancement of floating or ground-mounted solar power projects of NTPC.
NTPC Enlisting EPC Vendors for Floating & Ground Mounted Solar Projects
Image: saurenergy.com

NTPC Ltd has provided a Notice Inviting Applications (NIA), inviting applications from qualified companies for the enlistment of EPC Vendors for the advancement of floating or ground-mounted solar energy projects of NTPC.

The scope of work to be performed by the chosen bidders will include the style, design, manufacturing, supply, packaging and forwarding, transport, dumping, storage space, installment as well as commissioning of grid-connected floating and/or ground-mounted solar PV projects (to be awarded to multiple/single prospective buyers) on complete basis. The vendors will additionally be required to offer comprehensive operation as well as maintenance of the plant as well as the transmission system for a period of 3 years from the day of successful completion of the trial run.

The programmers will certainly also be needed to conduct the topographical study as well as geotechnical investigation of the land and also bathymetry survey of water body (for floating solar projects), and style and also construction of structure & installing framework for SPV panels.

The last day for entry of applications is September 16, 2020, and also the applications will be opened for testimonial on September 17, 2020.

To be qualified, the candidate needs to have designed, supplied, put up/ supervised erection and appointed/ monitored commissioning of the grid-connected solar plant(s) of cumulative set up capability of 40 MWp or greater, out of which a minimum of one plant should have been of 10 MWp or higher capability. The recommendation plant of 10 MWp or greater capability need to have been in effective operation for at the very least 6 months before the last date of entry of application for enlistment.

Monetarily, the ordinary yearly turnover of the applicant, should not be less than Rs 200 crore throughout the coming before three financial years to the last date of submission of application for enlistment.

The NIA additionally states that all EPC vendors that have been formerly gotten by the NTPC and also are interested in being gotten for this are also called for to submit the fresh application for enlistment.




SOLAR DIRECTORY
Solar Installers, Manufacturers