Infinis Launches 87 MW Solar Projects in UK Expansion

Sep 25, 2025 10:21 AM ET
  • Infinis Solar Developments launches two UK solar parks, powering 20,000+ homes with 87 MW capacity, featuring cutting-edge battery storage and green infrastructure enhancements.

Infinis Solar Developments Ltd has commenced construction on two photovoltaic parks in the UK, totaling approximately 87 MW. Ethical Power will serve as the main engineering, procurement, and construction contractor. The 37.3-MW Ford Oaks Solar Park in Devon will cover 45 hectares and is expected to generate 37 GWh annually, powering over 10,000 homes. Infinis acquired this project from Taiyo Power and Storage, with plans for green infrastructure improvements.

In the Vale of Glamorgan, Wales, Infinis will develop a 50-MW solar farm integrated with a 46-MW battery energy storage system. The Oaklands Solar and BESS Energy Park is projected to produce 70 GWh annually and is set to be operational by the end of 2026.

What are the key details of Infinis Solar's new UK photovoltaic projects?

  • Infinis Solar Developments Ltd is expanding its renewable energy portfolio with two new photovoltaic projects in the UK.
  • The projects have a combined capacity of approximately 87 MW.
  • Ethical Power is appointed as the main engineering, procurement, and construction contractor for both projects.
  • The Ford Oaks Solar Park in Devon will have a capacity of 37.3 MW and cover 45 hectares.
  • This solar park is expected to generate 37 GWh annually, sufficient to power over 10,000 homes.
  • Infinis acquired the Ford Oaks project from Taiyo Power and Storage.
  • Plans for the Ford Oaks site include green infrastructure improvements.
  • In the Vale of Glamorgan, Wales, Infinis is developing a 50-MW solar farm.
  • The Welsh project will be integrated with a 46-MW battery energy storage system.
  • The Oaklands Solar and BESS Energy Park is projected to produce 70 GWh annually.
  • The Oaklands project is scheduled to be operational by the end of 2026.