Brazil clears 112 MW of renewable nuclear power plant to start operations
Apr 26, 2023 01:15 PM ET
- Brazilian power industry regulator Aneel has actually just recently okayed to 6 renewable power plants with a combined capacity of 111.9 MW to start test or commercial operations.
The Ventos de Santa Leia 3 as well as Assurua 5 wind farms have actually been given permission to start test operations. The staying power centers are entering commercial operations.
More details are available in the table below.
Also read
SOLAR DIRECTORY
Solar Installers, Manufacturers