NTPC as well as AAI Sign MoU to Promote Solar Plants as well as EVs at Airports
actually announced that it has signed a Memorandum of Understanding (MoU) with NTPC Vidyut Vyapar Nigam (NVVN), a wholly-owned NTPC subsidiary, to promote
Nov 6, 2020 // Plants, Large-Scale, India, NTPC, Asia, electric vehicles, AAI, EVs, Airports, NVVN
NTPC Tenders for 1200 MW ISTS-Connected Solar Projects in India
NTPC Ltd has actually welcomed on-line proposals from qualified prospective buyers for the option of solar energy designers for establishing 1200 MW ISTS-Connected solar PV power projects throughout India.
The last day for entry of proposals is March 19, 2020, and also the techno-commercial quotes will certainly be opened on the very same day. The day and also time of opening of the rate quotes as well as the e-reverse public auction will certainly make love individually by NTPC to the practically picked prospective buyers.
A pre-bid conference has actually been set up for March 6, 2020, to resolve the issues increased by the possible bidders. And All proposals need to be accompanied by Earnest Money Deposit for a quantity determined at the price of Rs 400,000 per MW of priced estimate proposal capability as well as in the type as specified in the RfS Documents.
The Request for Selection (RfS) for the tender will certainly be offered for download from February 20, 2020.
For more details visit this site.
In January, we had actually reported that NTPC had actually wrapped up the e-reverse public auction for its 1,000 MW of solar projects tender under the Develop Build Demonstrate (DBDT) program, granting 560 MW ability to 3 prospective buyers. According to sector resources, the 1,000 MW solar tender had actually been undersubscribed, obtaining bids for just 700 MW. As the tender had actually been undersubscribed, just 80 percent or 560 MW of the quote ability was granted out of the 1,000 MW tender.
The 3 prospective buyers that were granted projects under the tender are Tata Power Solar which won 300 MW capability after sending the most affordable quote with an EPC quote of Rs 1.925 crore, Jakson Limited was granted 110 MW as well as Larsen & Toubro Limited (L&T) was granted 150 MW project capability under the tender after sending a proposition for 300 MW ability.
A lot more lately, the Solar Energy Corporation of India (SECI) has actually reported a checklist of 9 prospective buyers that have actually sent potential proposals versus the nodal companies 1.2 GW solar tender (ISTS-VIII) which was released in January.
The 9 companies that have actually sent proposals are ReNew Power, Softbank, Avaada, O2 Power, Brookefield, Eden, Tata, Ayana, as well as IB Solar, with overall propositions sent for 3.5 GW. Restore Power as well as Softbank-backed SB Energy sent the most significant proposals at 600 MW each, behind them Avaada sent a single bid for 500 MW. The staying 6 prospective buyers each sent bids for 300 MW ability each.
Feb 19, 2020 // Plants, Large-Scale, Commercial, India, tender, NTPC, Asia
BHEL issues tender for power cables for floating solar projects by NTPC
supply of high-tension power cables for the floating PV projects developed for NTPC Limited. The Kayamkulam and Simhadri facilities have generation capacities of
Jan 23, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, Floating PV, India, tender, floating PV, Asia, bhel
NTPC Tenders for O&M of 10 MW Solar Plant in Telangana
NTPC Ltd has issued a tender for the biennial operation and maintenance (O&M) contract for the 10 MW solar PV plant at the NTPC-Ramagundam in Telangana for 2020-22.
All bidders must also submit an Earnest Money Deposit of Rs 2 lakh along with their bids. However, all Micro and Small Enterprises (MSEs) registered with District Industries Centers or Khadi or any other body specified by Ministry of Micro, Small and Medium Enterprises as per MSMED Act 2012, shall be issued the bid documents free of cost and shall be exempted from paying Earnest Money Deposit.
The scope of work for the selected bidders will include the washing of solar modules/ panels twice every day in the morning and evening hours to avoid thermal shocks, rectification of ground fault or other faults in system as early as possible to ensure the plant availability up to 100 percent, to generate all reports as required by EIC after Solar Hours on daily basis, etc.
As per the tender, the contract service period shall be 24 months from the date of start of work. The contract period can be further extended for three months or part thereof on mutual agreement with the same rates, terms and conditions of the contract. The defect liability for the subject work shall be 6 months from the date of completion of work. Any defects observed during this period shall be rectified by you at no extra cost to NTPC.
To be eligible for participating in the bidding process, the bidder should have executed the work of erection and commissioning or operation & maintenance of at least one 5 MW or above the capacity of solar power plant having connectivity with grid, in the preceding seven years reckoned as on the date of scheduled techno-commercial bid opening.
And the average annual turnover of the bidder in the preceding three financial years reckoned as on the date of scheduled techno-commercial bid opening shall not be less than Rs 59.91 lakh.
The last date for bid submission is February 10, 2019, and the techno-commercial bids will be opened on the following date i.e. February 11, 2019.
Jan 28, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, India, O&M, NTPC, Asia, solar plant
Tata Power Solar Bags 250 MW Solar Project From NTPC Under CPSU Scheme
subsidiary of Tata Power, has received a Letter Of Award (LOA) from NTPC for a 250 MW solar project under the CPSU scheme.
The total value of the
Jan 13, 2020 // Plants, Large-Scale, Commercial, India, NTPC, Asia, tata power solar
NTPC Tenders for 100 kW Rooftop Solar System
NTPC Ltd has actually provided a tender, welcoming quotes from qualified prospective buyers for establishing of 100 kW on-grid roof solar energy system at its Singrauli Super Thermal Power Station, Uttar Pradesh.
The range of help the chosen prospective buyers will certainly consist of the layout, supply, setup, screening as well as appointing of 100 kWp roof solar energy system. The picked prospective buyers will certainly have a duration of 365 days to finish the deal with the project. The project developer will certainly additionally be in charge of supplying thorough upkeep for the plant for a duration of 5 years under an Annual Maintenance Contract-- CAMC.
The last day for quote entry is April 27, 2020, as well as the techno-commercial proposals will certainly be opened on April 29, 2020. All prospective buyers should additionally send an Earnest Money Deposit of Rs 50 thousand together with their quotes.
To be qualified for taking part in the bidding procedure, the prospective buyers have to have carried out the job as defined in the range of the tender for of one grid-connected roof solar PV plant of 50 kWp capability or even more, throughout the last 7 years, from the day of techno-commercial quote opening and also satisfying the adhering to standards as suggested listed below:
A solitary order of value not less than Rs 33.84 lakh. OR
2 orders of value not less than Rs 21.15 lakh each. OR
3 orders of value not less than Rs 16.92 lakh each.
In addition, a minimum of one recommendation plant of 50 kWp or over have to have remained in effective procedure for at the very least one year from the day of the techno-commercial proposal opening.
Economically, the prospective buyer should have a typical yearly turn over in the coming before 3 fiscal years not be less than Rs 42.3 lakh.
Just recently, we had actually reported that India's biggest power generation utility NTPC and also state-owned Solar Energy Corporation of India (SECI) will certainly quickly be authorizing an arrangement with the Rajasthan federal government for establishing of 2 renewable resource parks of 5 GW capability each. This will certainly be the very first stage of the recommended 25 GW ultra huge renewable resource park in Jaisalmer, Rajasthan.
Mar 30, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, Rooftop PV, India, NTPC, Asia, rooftop PV, SSTPS
GRIDCO Will Acquire 200MW Solar Power from NTPC
a Power Sale Agreement (PSA) with National Thermal Power Corporation (NTPC) in Bhubaneswar for the purchase of clean energy.
The main statement of
Apr 19, 2022 // Markets & Finance News, India, NTPC, Asia, RPO, GRIDCO, Odisha Solar
NTPC 1.2 GW ISTS solar auction sees hostile tariff of INR 2.43/ kWh.
Interstate Transmission System (ISTS) linked solar projects, conducted by the NTPC. The public auction saw the most affordable winning quote of INR 2.43/
Aug 10, 2020 // Markets & Finance News, Tariffs, India, Asia, tata power, Azure Power, AMP Energy, O2 Power
NTPC Tenders for 50 MW Solar Project in Jharkhand
NTPC Vidyut Vyapar Nigam Limited' (NVVN) has actually provided a tender, welcoming on the internet proposals from qualified prospective buyers for the growth of a 50 MW grid-connected solar PV power project at Panchet in Jharkhand.
The range of help the picked prospective buyers will cover style, design, production, packaging, forwarding, and also supply, screening, transport, discharging, storage space, setup, appointing of grid-connected solar PV project on around 290 acres of land at Panchet, in the state of Jharkhand. The range will certainly likewise consist of procedure and also upkeep of the solar plant consisting of plant facilities for 25 years on the basis of a solitary factor obligation.
The discharge of the produced solar energy to nearby 33 kV DVC-Panchet switchyard (as much as 33 kV Bus of existing DVC Panchet Switchyard), building (supply, erection, screening, as well as appointing) of facilities consisting of however not restricted to 33 kV transformers, linking line/cable, bays/switchgear, metering plan, and so on with all linked civil and also electric jobs will certainly additionally be under the extent of the designers.
The last day for proposal entry is March 30, 2020, and also the techno-commercial proposals will certainly be opened on March 31, 2020.
To be qualified for taking part in the bidding procedure, the ordinary yearly turn over of the Bidder, must not be less than Rs 200 crore throughout the coming before 3 fiscal years as on the last day of entry of Bid. And also the total assets of the Bidder as on the last day of the coming before fiscal year must not be less than 100 percent of Bidder's paid-up share funding.
Lately, NTPC Vidyut Vyapar Nigam Limited (NVVN) had actually welcomed proposals on a 'Limited Tender' bidding process basis for the procedure of 90 electrical buses for a duration of 10 years in the city of Bengaluru, Karnataka.
The extent of the proposition consists of the procedure of the electrical buses in the city of Bengaluru. The wide range of the proposition consists of the procedure of the electrical buses on offered paths in the city based on the legal regulations as well as policies in the state of Karnataka sticking to the moment timetables suggested by NVVN & Authority.
Mar 17, 2020 // Plants, Large-Scale, Commercial, India, tender, NTPC, Asia, Jharkhand
NTPC Starts Commercial Operation On India's Largest Floating Solar Power Plant
of the PSU to 54749.20 MW. The team installed and commercial capacity of NTPC stands at 69114.20
Jun 24, 2022 // Plants, Large-Scale, Commercial, Floating PV, India, NTPC, Asia, kerala, floating solar power plant, Commercial operations
Maha, NTPC to establish ultra-mega 2500-MW solar energy park
State Power Generation Co (MAHAGENCO) and National Thermal Power Corporation (NTPC) will create a joint venture to establish an "ultra-mega solar park" in the
Apr 8, 2022 // Plants, Large-Scale, Commercial, Maharashtra State Power Generation Co, MAHAGENCO, National Thermal Power Corporation, Uddhav Thackeray, ultra mega solar park
NTPC Tenders for Installation of 550 kW Rooftop Solar Projects
NTPC Limited has issued a tender for the installation of rooftop solar projects at two of its locations worth a combined generational capacity of 550 kW. The first project, a 500 kW rooftop system will be installed at the TSTPS in Kaniha and the second, a 50 kW system will be installed in TTPS in Talcher.
The scope of work for the selected bidders will include the supply, installation, testing, and commissioning of the two rooftop solar power plants. The project developers will also be required to provide comprehensive operation and maintenance services for the plants for a period of 5 years from the date of successful commissioning.
The last date for bid submission is January 21, 2019, and the techno-commercial bids will be opened on the next date i.e. January 22, 2019. The date and time of opening of the price bids will be intimated to the technically cleared bidders later. The estimated cost of the project is Rs 2.82 crore and all bidders must submit an Earnest Money Deposit of Rs 5 lakh along with their bids.
To be eligible for participating in the bidding process for the tender, all interested bidders must have experience of successfully having designed, supplied, ‘erected/ supervised erection’ and ‘commissioned/ supervised commissioning’ of grid-connected solar photovoltaic based power plant of at least one plant of 100 KWp or above and cumulative capacity of 440 KWp or above.
The reference plant of 100 KWp or above capacity must have been in successful operation for at least six (6) months as on the last date of the month preceding the month of publication of NIT.
Furthermore, the average annual turnover of the bidder in the preceding three financial years as on the date of techno-commercial bid opening shall not be less than Rs 2.82 crore i.e. cost of the tender.
Recently, NTPC had revealed that it is planning to add 10 GW of solar energy generation capacity by 2022, which entails an investment of around Rs 50,000 crore, to be funded mainly by green bonds. At present, the Navratna company has installed renewable energy capacity of 920 MW, which includes mainly solar energy. It has formulated a long term plan to become a 130 GW company by 2032 with 30 percent non-fossil fuel or renewable energy capacity.
Jan 8, 2020 // Plants, Markets & Finance News, Rooftop PV, India, tender, NTPC, Asia, rooftop PV
NTPC to construct 4.75 GW solar project in Gujarat, declared to be India's largest
Monday (12 July) MNRE gave the go-ahead to the center, which NTPC cases will be India's largest solar plant to day. The New Delhi-based business likewise
Jul 15, 2021 // Plants, India, NTPC, Asia, gujarat, green hydrogen, mnre
Tata Power's Renewable Arm Wins 300 MW Solar Project from NTPC
grid-based solar EPC agreements from industry-leading public market task like NTPC. This being a DCR project, we will certainly be constructing the project with
Apr 7, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, India, NTPC, floating PV, Asia, grid, Ashish Khanna, tata power, Praveer Sinha
NTPC Seeking EPC Contractors for as much as 1070 MW Solar Projects in Rajasthan
NTPC Ltd has provided a tender, inviting bids from eligible companies for taking up the Engineering, Procurement as well as Construction (EPC) work together with land for the growth of as much as 1070 MW of solar PV power projects own Rajasthan.
The scope of benefit the selected bidders will certainly include the design, design, manufacturing, supply, packing and also forwarding, transport, discharging, storage space, installment as well as appointing of grid-connected solar PV projects located throughout Rajasthan on a turnkey basis. The scope of benefit the solar plant approximately the interconnecting substation will consist of the complete transfer of possession/ lease of encumbrance cost-free land in favour of NTPC.
The programmers will additionally be needed to offer detailed procedure & maintenance of the complete solar PV plant including switchyard and power evacuation system till STU substation along with consumables and also spare components for a duration of three years from the day of successful completion of a dry run.
The individual projects granted under the tender will be of a minimum of 50 MW or greater capability in multiples on 10 MW.
The last day for bid submission is September 17, 2020, and also the techno-commercial bids will certainly be opened on the very same day. The date as well as time of opening of the rate bids as well as the begin of the reverse public auction will make love individually by NTPC to the technically removed bidders.
A pre-bid conference has actually been arranged for September 3, 2020, to resolve the issues elevated by the possible bidders. The bid safety amount to be sent by the effective prospective buyers will certainly vary on the project dimension ranging from Rs 2 crore to Rs 50 crore.
To be eligible for taking part in the bidding procedure, the prospective buyer ought to have created, provided, set up/ overseen erection as well as commissioned/ supervised commissioning of solar energy plant(s) of collective installed capability of 40 MWp or higher, out of which at the very least one plant must have been of 10 MWp or higher capacity. The recommendation plant of 10 MWp or higher ability must have remained in successful operation for at least 6 (6) months before the date of techno-commercial bid opening.
Monetarily, the typical annual turn over of the prospective buyer, need to not be less than Rs 210 crore throughout the preceding three financial years as on date of techno-commercial bid opening. And Also the Net Worth of the bidder as on the last day of the preceding financial year should not be less than 100 percent of bidder's paid-up share resources.
Aug 18, 2020 // Plants, Large-Scale, Commercial, India, tender, NTPC, Asia, Rajasthan, solar projects