Mumbai Metro Tenders for 4.43 MW Rooftop Solar Projects

Feb 14, 2020 11:58 AM ET
  • MMRDA has actually released a tender for establishing 4.43 MW of roof solar PV projects at the terminal website of the Mumbai Metro Rail
Mumbai Metro Tenders for 4.43 MW Rooftop Solar Projects
Image: saurenergy.com

The Mumbai Metropolitan Region Development Authority (MMRDA) has actually provided a tender, welcoming quotes from qualified companies for establishing 4.43 MW of roof solar PV projects at terminal website of the Mumbai Metro Rail.

The range of help the picked prospective buyers will certainly consist of the style, design, manufacture, supply, storage space, civil job, erection of the appropriate framework, screening and also appointing of the roof solar PV project under RESCO design at terminal Site of Mumbai Metro Rail Project for Line 7 2A amounting to around 4.43 MWp. The project programmers will certainly be needed to finish the service the installment of the projects within of 15 months from the day of issuance of the letter of honor.

The prospective buyers will certainly likewise be called for to offer detailed Operation and also Maintenance (O&M) of the Project for a duration of 25 years.

The last day for quote entry is March 26, 2019, and also the economic and also techno-commercial proposals will certainly be opened on the complying with day i.e. March 27, 2019. A pre-bid conference has actually been arranged for February 28, 2019, to attend to the issues elevated by the possible bidders.

The tender safety quantity that all prospective buyers require to send is Rs 9.96 lakh in addition to an Earnest Money Deposit of Rs 1 lakh.

In April 2019, the MMRDA had actually provided a tender for establishing of 7.63 MW of roof solar PV power projects under RESCO design at terminal websites of Mumbai Metro Rail Project for the very same line 7 and also 2A.

A lot more lately in December 2019, DMRC principal Mangu Singh had actually claimed that all future structures of Delhi Metro will certainly be made to quickly suit roof photovoltaic panels as well as to at some point obtain leading rating from eco-friendly structure ranking authorities. Insisting that all terminals integrated in the future will certainly have the ability to fit roof photovoltaic panels straightway, Singh stated, "In phase-1 as well as phase-2 frameworks were not made to suit roof photovoltaic panels, so adjustments needed to be made."




SOLAR DIRECTORY
Solar Installers, Manufacturers