Cox to Develop 248 MWp Solar Farms in Seville

Oct 18, 2024 09:47 AM ET
  • Cox secures a groundbreaking solar project in southern Spain, powering five new farms to boost renewable energy by 248 MWp—ushering in a sustainable future by 2026!

Cox, a Seville-based energy and water utility, has secured a contract from UK’s Lightsource bp to construct five solar farms totaling 248 MWp in southern Spain. The project includes solar farms named Gerena 1, 2, and 3, as well as Guillena 1 and 2, all located in the municipalities of Guillena, Burguillos, and Alcala del Rio.

Cox's energy division will handle the engineering, procurement, operation, and maintenance of the solar farms for two years once construction is complete. The Gerena farms will connect at 220 kV, while the Guillena farms will utilize 400 kV connections. The solar farms are expected to be operational by 2026.

What are the key details of Cox's solar farm contract with Lightsource bp?

Here are the key details of Cox's solar farm contract with Lightsource bp:

  • Contract Overview: Cox, a utility company based in Seville, has entered into a contract with UK’s Lightsource bp to build five solar farms in southern Spain.
  • Project Capacity: The total capacity of the solar farms is 248 megawatts peak (MWp), signaling a substantial addition to the region's renewable energy resources.
  • Solar Farm Identification: The specific solar farms included in the project are named Gerena 1, Gerena 2, Gerena 3, Guillena 1, and Guillena 2.
  • Geographical Location: The solar farms are strategically located across the municipalities of Guillena, Burguillos, and Alcala del Rio, providing access to optimal sunlight conditions.
  • Operational Management: Post-construction, Cox's energy division will be responsible for the engineering, procurement, operation, and maintenance of the solar farms for a period of two years.

Connectivity Features:

  • The Gerena solar farms will have a connection at 220 kV, facilitating efficient energy transmission.
  • The Guillena solar farms will utilize a higher 400 kV connection, which can accommodate larger volumes of electricity.
  • Timeline: The solar farms are projected to commence operations by the year 2026, contributing to Spain's renewable energy goals.
  • Sustainability Impact: This initiative supports Spain's commitment to increasing its renewable energy capacity and reducing carbon emissions, aligning with EU sustainability objectives.
  • Economic Benefits: The project is expected to generate local jobs during the construction phase and in ongoing operations and maintenance, potentially boosting the regional economy.
  • Partnership Significance: This collaboration between a local utility (Cox) and an international energy company (Lightsource bp) highlights the growing trend of cross-border partnerships in renewable energy development.
  • Future Projections: As the global demand for renewable energy increases, initiatives like this may pave the way for more solar projects and collaborations within Spain and beyond.



SOLAR DIRECTORY
Solar Installers, Manufacturers