Soltec supplies single-axis trackers for 56-MW Hawaii solar project portfolio
of 108,192 modules, bringing Soltec's complete supply of trackers to 210 MW in Hawaii. The tracker is made for surface with high inclines and rolling hills and also
Dec 15, 2022 // Plants, Markets & Finance News, USA, Hawaii, North America, Soltec, Solar Project
Nexamp to create 7 community solar projects in Hawaii for LMI residents
Hawaiian Electric conducted a competitive bidding procedure and evaluated propositions from a variety of solar and also storage programmers, picking Nexamp exclusively to build, possess and run the first round of projects.
" Getting these projects authorized is a turning point that reflects the effort of our whole group to produce solutions that attend to the demands of the communities in which we operate," said Chris Clark, primary development officer at Nexamp. "Our commitment to accessibility shapes everything we do, from signing up subscribers to giving financial and employment possibility. Each of our thousands of successful projects around the nation represents a long-term commitment to the people and also businesses of the community."
The 7 solar farms will be the initial of their kind under the CBRE program on each island as well as are anticipated to be operational by the end of 2025.
Kalaoa Solar A, Hawaii Island, 4.3 MW DC (3 MW AC) solar + 13.7 Megawatt-hour storage
Kalaoa Solar B, Hawaii Island, 4.3 MW DC (3 MW AC) solar + 13.7 Megawatt-hour storage
Nā' ālehu Solar, Hawaii Island, 4.2 MW DC (3 MW AC) solar + 13.7 Megawatt-hour storage
Līpoa Solar, Maui, 4.2 MW DC (3 MW AC) solar + 13.7 Megawatt-hour storage
Makawao Solar, Maui, 3.5 MW DC (2.5 MW AC) solar + 10.9 Megawatt-hour storage
Pi'iholo Road Solar, Maui, 3.5 MW DC (2.5 MW AC) solar + 10.9 Megawatt-hour storage
Kaukonahua Solar, Oahu, 7.8 MW DC (6 MW AC) solar (co-developed with Melink Solar).
Community solar, or shared solar, enables any resident to register for a solar farm as well as obtain credit scores on their regular monthly utility bill that help to lower their annual electrical expenses. These certain shared solar farms are booked solely for low- and moderate-income subscribers, making sure that those who qualify will take advantage of the cost savings of shared solar. Several are tenants or house dwellers and do not have access to privately possessed rooftop solar.
" In addition to bringing savings to those who require them most, these projects will certainly transport new government funding to Hawaii provided by the just recently passed Rising cost of living Reduction Act and also help the state better its goal of reducing its dependancy on nonrenewable fuel sources," included Clark. "The unique ecological nature as well as island geography of Hawaii makes this job all the more vital as a step in ensuring a clean and lasting future for the future generation. We expect getting going.".
Dec 15, 2022 // Plants, Large-Scale, Commercial, USA, Hawaii, North America, Nexamp, Solar Project
Hawaii launches mega 900MW renewables tender
Hawaiian Electric Co (HEC) has kickstarted a colossal clean energy tender, seeking providers of 900MW worth of renewables and energy storage projects.
The tender launched on Monday is the largest renewables procurement ever issued in the state, with an estimated capacity of 2,000GWh annually.
The investor-owned utility is soliciting 594MW worth of solar for O'ahu island – together with 135MW for Maui and up to 203MW for Hawai'i – from local and global developers.
All renewables for Maui and Hawai'i must include energy storage, whereas on O'ahu, such partnerships remain optional.
Hawaii has pledged to be powered entirely by renewables by 2045. O’ahu’s 180MW AES coal-fired power plant, which meets 16% of peak power demand on the island, is due to close by September 2022. On Maui, the 27.6MW Kuhului oil-fired plant will be decommissioned in 2024.
Storage on O'ahu and Maui is also being sought to replace firm generating units, which can be provided by renewable generation paired with storage or standalone storage. Contingency storage is also being sought for O'ahu and Hawai'i islands.
Clean energy moves later this year for smaller islands
The winning projects are expected to be selected by May 2020 and come online between 2022 and 2025.
A separate request for proposals for grid services from customer-sited distributed energy resources on O'ahu, Maui, and Hawaii was also launched. The winning projects, which can range from 4-119MW, are expected to be awarded in January 2022 and come online by 2022 at the latest.
According to the HEC, Hawaii’s public utilities commission has engaged independent observers and technical advisers to ensure that all proposals are treated fairly and equitably “due to the complexity of projects sought.”
Later this year, HEC will issue requests for proposals for renewables for two of Hawaii’s smaller islands, pending approval by the state's public utilities commission. It will seek the equivalent of 4MW of solar-plus-storage or 3.6MW of wind-plus-storage for Moloka’i. The equivalent of around 9.5MW of solar-plus-storage will be pursued on Lana’i.
In the first phase of Hawaii’s renewables procurement in 2018, eight projects totalling 260MW/1GWh of solar-plus-storage were negotiated on O’ahu, Maui and Hawai’i. Prices arranged for those projects, which will come online by 2021, average 9.38 US dollar cents per KWh, lower than the current cost of fossil fuel generation, which is about 15 cents per KWh.
Aug 27, 2019 // Plants, Large-Scale, Commercial, Storage, USA, storage, tender, solar-plus-storage, Hawaii, North America, Hawaiian Electric Co, maui, o'ahu
Hanwha Energy protects large-scale solar-plus-storage project in Hawaii
system is slated to start commercial procedure in 2023.
The state of Hawaii is seeking to switch over to 100% renewable energy by 2045. To support the
Oct 27, 2020 // Plants, Large-Scale, Storage, USA, solar-plus-storage, Hawaii, North America, Hanwha Energy
Clearway breaks ground on 75 MW of solar projects in Hawaii
year.
Both sites contribute to 3 solar projects that Clearway finished in Hawaii in 2019. The five centers with a mixed 185 MW of ability will serve
Apr 9, 2021 // Plants, Large-Scale, Commercial, USA, Hawaii, North America, clearway, solar projects, Scott Seu
AES breaks ground in Hawaii on two large-scale solar-plus-storage plants
battery energy storage system (BESS) technology. The project gets on Maui, Hawaii's second-largest island.
AES Corporation executives and representatives of
Aug 10, 2022 // Plants, Large-Scale, Commercial, Storage, USA, Hawaii, North America, AES, solar-plus-storage plants
Longroad Energy Selected for 160 MW Solar With 640 MWh BESS in Hawaii
Power has actually been picked by the Hawaiian Electric Company (HECO) to start developing 2 utility-scale solar and battery storage projects for conclusion
Jun 1, 2020 // Plants, Large-Scale, Commercial, Storage, USA, storage, Solar, Battery Storage, Hawaii, North America, longroad energy, International
Hawaii's solar tender will certainly enhance state's ability 50%.
renewable resource purchase ever before advanced by United States utility Hawaiian Electric Company (HeCo) have actually been introduced, bringing with them as
May 19, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, USA, tender, Hawaii, North America
Hawaii's renewable tender to deliver major solar and storage push
utility Hawaiian Electric stated today the tender it released last August had actually picked 16 solar-plus-storage or standalone storage space
May 14, 2020 // Plants, Large-Scale, Commercial, Markets & Finance News, Storage, USA, pv power plants, tender, solar-plus-storage, Hawaii, North America, hawaiian electric, Jim Alberts
Virtual power plant professional Swell Energy reveals software application platform ahead of 80MW Hawaii project
of battery storage space, with utilities Souther California Edison (SCE) and Hawaiian Electric Co (HECO), along with a smaller project with Disadvantage Edison in
Feb 14, 2022 // Plants, Residential, Storage, Software, VPP, virtual power plant, utility, Swell Energy, aggregation, algorithmic optimisation
Altus Power America building Hawaii's biggest community solar project
operation. This will certainly be Altus Power's third financial investment in Hawaii and the very first to specifically offer power financial savings, via CBRE
Feb 26, 2021 // Plants, Large-Scale, USA, Hawaii, North America, Altus Power, Solar Project, Lars Norell, Ryan McCauley
Hanwha to develop a 60 MW/240 MWh solar energy plant in Hawaii
for the next 20 years. Estimated commercial procedures begin remains in 2023. Hawaii aims to produce 100 percent of its electrical energy from eco-friendly sources
Nov 13, 2020 // Plants, Large-Scale, Commercial, Asia, Korea, Hanwha, Solar Power Plant
Home solar batteries in Hawaii to provide capability, grid solutions through 80MW virtual power plant
that it is gotten with the United States island state's main power energy, Hawaiian Electric, to perform the project, which would certainly pair greater than
Jan 18, 2021 // Residential, Storage, USA, solar-plus-storage, Hawaii, North America, VPP, virtual power plant, Swell Energy, Yoh Kawanami
REC Solar installs specialized project at observatory atop dormant volcano in Hawaii
situated near the summit of Mauna Kea, a dormant volcano on the Big Island of Hawaii-- lies on the roof of Keck Observatory's telescope facility, between the domes
Dec 11, 2020 // Plants, USA, Hawaii, North America, REC Solar, Mark Devenot, Dan Alcombright
Burns & McDonnell to build solar microgrid for U.S. Navy Joint Base Pearl Harbor-Hickam
state of Hawaii is proud to pursue this innovative project,” Governor Ige says. “PEARL will advance the state’s clean energy vision of
Dec 18, 2019 // Grids, USA, North America, PEARL, Burns & McDonnell, HCATT, David Ige, David Molinaro, John Bothof