A 20-year power supply bargain for 238 MW of solar in Brazil

Mar 5, 2020 12:38 PM ET
  • French developer Voltalia has actually acquired to provide solar energy to Brazilian polycarbonate material firm Braskem. The solar plant which will certainly produce the electrical energy is prepared as a growth of 2 centers designated by the Brazilian federal government in a public renewable resource public auction.
A 20-year power supply bargain for 238 MW of solar in Brazil
Image: RonnyK/Pixabay

Brazilian polycarbonate material business Braskem has actually concurred a 20-year power acquisition arrangement (PPA) to acquire solar energy from a big range PV plant French renewables developer Voltalia will certainly construct in Brazil.

The project is a growth of 2 functional solar plants which have a complete generation ability of 32 MW in the state of Rio Grande do Norte. Voltalia created the Serra do Mel I as well as II solar ranches under Brazil's public auction system for huge range renewables.

Building of the intended 238 MW development of the website is intended to start in the 2nd fifty percent of the year, with conclusion set up for the very first fifty percent of 2022. Via the brand-new generation capability, Voltalia will certainly additionally offer power to various other huge commercial customers, consisting of Brazilian utility Copel, through 10 to 20-year PPAs.

A current research by Brazilian working as a consultant Greener claimed around 3.2 GW of unsubsidized solar project ability was allowed for industrial procedure and also at a sophisticated phase of advancement in the nation.

In June in 2014, power supply bargains were being discussed in between programmers and also power off-takers associated with some 2 GW of unsubsidized solar project ability, according to Rodrigo Sauaia, CEO of Brazilian solar power organization ABSOLAR.




SOLAR DIRECTORY
Solar Installers, Manufacturers