Largest PV power plants list
World's largest photovoltaic power stations in 2024. PV parks, PV farms.
(Updated October 2024)
Find a list of solar photovoltaic plants that are currently considered the largest on the globe. We have listed the ground-mounted utility-scale stations, which have already been connected to the power grid and are currently operating. The capacity of solar farms included ranges from hundreds to thousands of megawatts.
World's largest photovoltaic power stations in 2024
Name | Country | Grid in | Capacity MWp or MWAC (*) | Location | Annual Output GWh | Land Size km² | Remarks | Developer |
---|---|---|---|---|---|---|---|---|
Talatan Solar Park |
begin in 2020, with commercial operations expected to commence by 2026 |
15,600 |
10,000 | 420 |
The project has been developed in multiple phases over time since 2011, rather than as a single initiative. One of the phases includes a site dedicated to testing 100 MW of various solar panel designs. |
|||
Hobq Solar Park |
2024 |
4,000 |
133 |
In Hanggin Banner and Dalad Banner, each site is set to develop 2 GW of solar power, with Dalad Banner planning an expansion to a total capacity of 13.5 GW. |
||||
Ruoqiang Solar Park |
2024 |
4,000 |
7,200 | 88.27 |
Surpassing Midong, it will become the largest photovoltaic station. |
|||
Otog Front Banner Solar Park |
2024 |
4,000 |
5,700 | 90 |
The project includes 3 GW across 70 square kilometers, owned by China Energy Group, alongside 1 GW managed by Inner Mongolia Energy Group. |
|||
Midong Solar Park |
2024 |
3,500 |
6,090 | 133 |
The largest single photovoltaic station. |
|||
Urtmorin Solar Park |
2024 |
3,300 |
1040[planned] |
|
||||
2020 |
2245 |
57 |
The planned capacity of 2,245 MWDC totally commissioned |
Rajasthan Solar Park Development Company Limited, Saurya Urja Company, Adani Renewable Energy Park Rajasthan | ||||
2020 |
2200 |
Built in five phases, it consists of 672 PV arrays with over 7 million PV modules |
Longyuan Power |
|||||
2019 |
2050 |
53 |
In Karnataka state |
|||||
Al Dhafra Solar project |
2023 |
2,000 |
21 |
The largest single-site project. |
||||
Nilka County PV Park |
2024 |
2,000 |
31 |
|
||||
2019 |
1650 |
37 |
In Aswan |
Egyptian Electricity Transmission Company |
||||
2016 |
1547 |
43 |
In Zhongwei, Ningxia |
China National Grid and Zhongwei Power Supply Co. |
||||
Sudair Solar PV Project |
2023 |
1,500 |
|
|
|
|||
Kalyon Karapınar Solar Power Plant |
2021 |
1,350 |
20 |
The 1,350 MW plant is now fully operational. |
|
|||
2019 |
1177 |
8 |
Located at Sweihan. |
Marubeni and Jinko Solar |
||||
2020 |
1013 |
Phase I completed in 2013, followed by Phase II and III. Phase IV (including 250 MW PV) is under construction, 950 MW Phase V is planned. |
ACWA Power |
|||||
2017 |
1000 |
24 |
Sweihan Solar Holding Company |
|||||
Datong Solar Power Top Runner Base |
2016 |
1000 |
Total capacity will be 3 GW in 3 phases. |
United PV |
||||
2021 |
978 |
In Nambulapulakunta Mandal of Andhra Pradesh state. Total planned capacity 1500 MW |
Tata Power Solar and Azure Power |
|||||
Gemini Solar Project |
2024 |
966 |
map |
Located in Nevada, the project has a capacity of 690 MWAC, along with 380 MW of battery storage. |
|
|||
Edwards Sanborn Solar and Energy Storage Project |
2024 |
864 |
map |
Includes 3,320 MWh of battery storage capacity. |
|
|||
São Gonçalo Solar Farm |
2020 |
864 |
map |
Phase II completed in February 2021, Phase III completed in January 2023 |
|
|||
2015 |
850 |
23 |
320 MW Phase I Completed in December 2013, 530 MW phase II in 2015 |
Longyangxia Reservoir |
||||
Escatrón-Chiprana-Samper Solar Farm |
2020 |
850 |
31.7 |
Complex of 17 projects |
|
|||
Xuan Thien - Ea Sup 1 |
2020 |
831 |
map |
|
600 MWac, four more units in planning |
|
||
Villanueva Solar Park |
2018 |
828 |
27.5 |
Enel Green Power |
||||
Lumina I and II Solar Project |
2024 |
828 |
map |
|
640 MWac |
|
||
Al Kharsaah solar power plant |
2022 |
800 |
|
|
||||
2020 |
794 |
1197 |
15.9 |
Phase 1 of 206 MWAC in May 2014. Phase 3 of 254 MWAC in July 2018. Phase 2 of 154 MWAC completed in January 2020. Total 614 MWAC |
8minutenergy Renewables |
|||
2018 |
750 |
6.4 |
RUMSL |
|||||
Solar Star (I and II) |
2015 |
747 |
1664 |
13 |
579 MWAC, 747.3 MWDC.[50] |
SunPower Services |
||
2012 |
690 |
20 |
Situated at Charanka village in Patan district of Gujarat. Capacity expected to go up to 790 MW in 2019. |
Gujarat Power Corporation Limited |
||||
2023 |
672 |
21,000 acres (8,500 ha) |
|
|
||||
Anhui Fuyang Southern Wind-solar-storage |
2023 |
650 |
map |
|
Floating solar |
|
||
2017 |
648 |
10.1 |
Construction began in 2016 and completed in record 8 months. |
Adani Power |
||||
Roseland Solar |
2023 |
640 |
map |
|
500 MWac |
|
||
Frye Solar Power Plant |
2024 |
637 |
map |
|
500 MWac |
|
||
Atkina Solar Power Plant |
2024 |
631 |
map |
|
500 MWac |
|
||
Spotsylvania Solar |
2021 |
618 |
14 |
4 phases completed in 2020 and 2021 |
|
|||
Solarpark Witznitz |
2024 |
605 |
|
|
Largest single plant in Europe |
|
||
Taygete Solar |
2023 |
602 |
|
|
459 MWac |
|
||
Lawan-Purohitsar Solar Farm |
2021 |
600 |
|
|
|
|||
Bikaner Solar Farm |
2022 |
600 |
|
|
|
|
||
Radhnesada Solar Park |
2023 |
600 |
|
|
In Gujarat |
|
||
2019 |
600 |
|
Phases 1 and 2 June 2019; phase 3 completed September 2019 |
|
||||
Hongshagang Solar Park |
|
574 |
|
|
Multi-phase project |
|
||
2016 |
552* |
1291 |
16.2 |
Largest in Nevada. Proposed fifth unit to add 250MW. |
Sempra Generation |
|||
2014 |
550* |
1268 |
19 |
Gradually commissioned since February 2013. Reached final capacity November 2014. |
First Solar, Inc. |
|||
2015 |
550* |
1287 |
16 |
Phase I of 300 MWAC completed 2013. Phase II to final capacity completed January 2015. |
First Solar, Inc. |
|||
Kenhardt Solar Power Complex Station |
2023 |
540 |
|
|
|
|
||
2018 |
500 |
China’s Three Gorges Group, Sunshine Power Co., Ltd |
||||||
2014 |
500 |
23 |
Phase I completed in October 2011, followed by Phase II and III. 60 MW phase IV under construction. Within a group of 1,000 MW of co-located plants |
Longyuan Power |
||||
2020 |
500 |
10 |
|
Iberdrola group |
||||
Yinchuan Xingqing Solar Farm |
2018 |
500 |
map |
|
|
|
||
Ibri II Solar Park |
2022 |
500 |
map |
|
|
|
||
Wulanmulun Solar Park |
2021 |
500 |
map |
900 |
28 |
|
|
|
Oberon Solar Project |
2023 |
500 |
map |
|
California, with 250 MW battery storage |
|
||
2019 |
494 |
10 |
||||||
Trung Nam Thuan Nam solar power plant |
2020 |
450 |
map |
|
||||
2019 |
443 |
717 |
5.7 |
350 MWAC |
8minutenergy Renewables |
|||
2014 |
410 |
740 |
9.7 |
290 MWAC |
First Solar, Inc. |
|||
2019 |
400* |
9.3 |
100MW Phase 1 and 200MW Phase 2. 400MW when completed in 2020. |
Sustainable Energy Capital Partners |
||||
2016 |
400* |
1140 |
9.3 |
Largest in Arizona. Up to 700 MWAC when complete. |
Zachry Holdings |
|||
Galiveedu solar park |
2018 |
400 |
Located in Galiveedu mandal of Kadapa district |
|||||
Ananthapuramu - II |
2019 |
400 |
17.0 |
Located at Talaricheruvu village in Tadipatri mandal of Anantapur district. Planned capacity 500 MW |
APSPCL |
|||
Loc Ninh Solar Park |
2021 |
350 |
700 |
Planned capacity 750 MW |
||||
2021 |
347 |
255 MW(AC), Texas, online February |
||||||
2020 |
324 |
240 MWAC, Texas |
||||||
2020 |
313 |
Located in New South Wales. Single Axis Tracking. Innogy |
Downer Group |
|||||
Sakaka PV IPP |
2019 |
300 |
Mahindra Susten and Chint Solar |
|||||
2015 |
300 |
380 |
2.5 |
NEOEN |
||||
2017 |
292 |
In Ribeira do Piauí, Piauí |
Enel Green Power |
|||||
2017 |
291 |
250 MWAC. Kern County, CA. Paired with 10 MWh/20 MW battery |
||||||
2018 |
281 |
6.5 |
281 MWDC/200 MWAC. Fresno County, CA |
Recurrent Energy |
||||
2017 |
280* |
11.7 |
130 MWAC completed November 2017. Full capacity year-end 2018. |
First Solar, Inc. |
||||
2016 |
272 |
547 |
8.1 |
272 MWDC/200 MWAC. Kern County, CA |
Recurrent Energy |
|||
2019 |
261 |
8.1 |
261 MWDC/200 MWAC. Twiggs County, GA |
First Solar, Inc. |
||||
2018 |
260 |
Enel Green Power |
||||||
2016 |
258 |
455 |
7.7 |
258 MWDC/200 MWAC. Fresno County, CA |
||||
2017 |
254 |
in Tabocas do Brejo Velho, Bahia |
Enel Green Power |
|||||
2016 |
250* |
658 |
6.82 |
First Solar, Inc. |
||||
2016 |
250* |
711 |
11.7 |
First Solar, Inc. |
||||
2016 |
250* |
629 |
8.1 |
First station on North American tribal lands. Commissioned March 2017. |
First Solar, Inc. |
|||
2016 |
250* |
745 |
9.3 |
First 250 MW commissioned June 2016. Two more 250MW phases proposed. |
First Solar, Inc. |
|||
2017 |
250 |
at Runija in Mandsaur district of Madhya Pradesh state |
Vikram Solar Limited |
|||||
2013 |
250* |
675 |
7.96 |
SunPower |
||||
2020 |
250 |
24 |
Total planned capacity 1000 MW. |
World's largest photovoltaic power stations in 2020
Name | Country | Grid in | Capacity MWp or MWAC (*) | Location | Annual Output GWh | Land Size km² | Remarks | Developer |
---|---|---|---|---|---|---|---|---|
Pavagada Solar Park | India | 2019 | 2050 | map | 53 | In Karnataka state, total planned capacity 2,050 MW | Karnataka Solar Power Development Corporation Limited | |
Tengger Desert Solar Park | China | 2016 | 1547 | map | 43 | 1,547 MW solar power was installed in Zhongwei, Ningxia by 2015. | China National Grid and Zhongwei Power Supply Co. | |
Bhadla Solar Park | India | 2019 | 1515 | map | 158 | 40 | The park is proposed to have a capacity of 2,255 MW to be completed by December 2019. | Rajasthan Solar Park Development Company Limited, Saurya Urja Company, Adani Renewable Energy Park Rajasthan |
Benban Solar Park | Egypt | 2019 | 1500 | map | 456 | 37 | Solar Park in Aswan, completed in November 2019. | Egyptian Electricity Transmission Company |
Noor Abu Dhabi | United Arab Emirates | 2019 | 1177 | map | 7.8 | Commercial operation achieved in June 2019. Located at Sweihan. | Sterling and Wilson. | |
Jinchuan Solar Park | China | 2019 | 1,030 | map | 90 | In Jinchuan, Gansu | ||
Danangouxiang Solar Park | China | 2021 | 1,020 | map | 92 | In Mori Kazakh, Xinjiang | ||
Fatehgarh Solar Park | India | 2023 | 1,000 | map | In Rajasthan | |||
Kurnool Ultra Mega Solar Park | India | 2017 | 1000 | map | 24 | 1000 MW operational as of December 2017 | Sweihan Solar Holding Company | |
Datong Solar Power Top Runner Base | China | 2016 | 1000 | map | 43 | 1 GW Phase I completed in June 2016. Total capacity will be 3 GW in 3 phases. | United PV | |
Longyangxia Dam Solar Park | China | 2015 | 850 | map | 23 | 320 MW Phase I Completed in December 2013, 530 MW phase II in 2015 | Longyangxia Reservoir | |
Villanueva Solar Park | Mexico | 2018 | 828 | map | 1700 | 24 | 828 MW when completed, expected completion in second half of 2018 | Enel Green Power |
Lumina I and II Solar Project | United States | 2024 | 828 | map | 640 MWac | |||
Rewa Ultra Mega Solar | India | 2018 | 750 | map | 6.4 | Rewa Ultra Mega Solar is an operational solar park spread over an area of 1,590 acres. | RUMSL | |
Prospero Solar I and II | United States | 2021 | 710 | map | 550 MWAC | |||
Charanka Solar Park | India | 2012 | 690 | map | 20 | Situated at Charanka village in Patan district of Gujarat. Capacity expected to go upto 790 MW in 2019. | Gujarat Power Corporation Limited | |
Kamuthi Solar Power Project | India | 2016 | 648 | map | 10.1 | The project covers an area of 2,500 acres | Adani Power | |
Mohammed bin Rashid Al Maktoum Solar Park | United Arab Emirates | 2019 | 613 | map | 460 | 77 | 1350 MW under execution | First Solar, Inc., ACWA Power, TSK |
Solar Star I and II | USA | 2015 | 579* | map | 1664 | 13 | Largest in California and US. 579 MWAC (747.3 MWp) connected to the grid on June 19, 2015. | SunPower Services |
Copper Mountain Solar Facility | USA | 2016 | 552* | map | 1291 | 16.2 | Largest in Nevada at 552 MWAC. Proposed Fifth Unit to add 250MW. | Sempra Generation |
Desert Sunlight Solar Farm | USA | 2015 | 550* | map | 1287 | 16 | Phase I of 300 MWAC completed 2013. Phase II to final capacity completed January 2015. | First Solar, Inc. |
Topaz Solar Farm | USA | 2014 | 550* | map | 1,268 | 19 | Reached final capacity November 2014. | First Solar, Inc. |
Wenzhou Taihan Solar Farm | China | 2021 | 550 | map | 650 | 5 | Floating solar farm over fish farm | |
Huanghe Hydropower Golmud Solar Park | China | 2014 | 500 | map | 317 | 23 | The project won the 2012 China Quality Power Project Award. Output is expected to be 317 GWh per year. | Longyuan Power |
NP Kunta | India | 2018 | 500 | map | 32.07 | In Nambulapulakunta Mandal of Andhra Pradesh state. Total planned capacity 1500 MW | Tata Power Solar, Azure Power | |
Three Gorges Golmud Solar Park | China | 2018 | 500 | map | The projects will be directly managed by the country’s National Energy Administration. | China’s Three Gorges Group, Sunshine Power Co., Ltd | ||
Mount Signal Solar | USA | 2018 | 460* | map | 1197 | 15.9 | Phase 1 of 206 MWAC in May 2014. Phase 3 of 254 MWAC in July 2018. Phase 2 of 154 MWAC projected in 2020. Up to 600 MWAC when complete. | 8minutenergy Renewables |
Mesquite Solar project | USA | 2016 | 400* | map | 1140 | 9.3 | Largest in Arizona. Up to 700 MWAC when complete | Zachry Holdings |
Pirapora Solar project | Brazil | 2018 | 400 | map | 392 | 10.3 | Located in Minas Gerais State, Brazil, the 399MW Pirapora solar complex is the biggest operating solar photovoltaic facility in Latin America. | Biosar Brasil-Energia Renovavel |
Ananthapuramu - II | India | 2019 | 400 | map | 17.0 | Located at Talaricheruvu village in Tadipatri mandal of Anantapur district. Planned capacity 500 MW | APSPCL | |
Yanchi Solar Park | China | 2016 | 380 | map | 525 | First phase of 380 MW completed in June 2016. Up to 2,000 MW when complete. | Minsheng New Energy | |
Springbok Solar Farm | USA | 2019 | 350* | map | 717 | 5.7 | At full build-out, it will be one of the world's largest PV solar farms with a capacity of about 440 MWp. | 8minutenergy Renewables |
Cestas Solar Park | France | 2015 | 300 | map | 380 | 2.5 | The Cestas Solar Park is a 300 MW photovoltaic power station in Cestas, France. | NEOEN |
Techren Solar Project | USA | 2019 | 300* | map | 9.3 | 100MW Phase 1 and 200MW Phase 2. Expected completion in 2019. | Sustainable Energy Capital Partners | |
Sakaka PV IPP | Saudi Arabia | 2019 | 300 | map | 6 | Being developed as part of the King Salman Renewable Energy Initiative, it is the first utility-scale solar power project in Saudi Arabia. | Mahindra Susten and Chint Solar | |
Nova Olinda Solar Farm | Brazil | 2017 | 292 | map | 6.9 | It’s EGP’s largest solar plant in Latin America | Enel Green Power | |
Agua Caliente Solar Project | USA | 2014 | 290* | map | 740 | 9.7 | 290MWAC project was completed in April 2014 | First Solar, Inc. |
California Flats Solar Project | USA | 2017 | 280* | map | 11.7 | 130 MWAC completed November 2017. Full capacity year-end 2018. | First Solar, Inc. | |
Don José Solar Farm | Mexico | 2018 | 260 | map | 625 | 13 | Don José is the fifth renewable plant commissioned by Enel Green Power worldwide in 2018, bringing the total commissioned capacity in the year to around 1 GW. | Enel Green Power |
Ituverava Solar Farm | Brazil | 2017 | 254 | map | 1150 | 6.9 | in Tabocas do Brejo Velho, Bahia | Enel Green Power |
Mandsaur Solar Farm | India | 2017 | 250 | map | 1.01 | at Runija in Mandsaur district of Madhya Pradesh state | Vikram Solar Limited | |
McCoy Solar Energy Project | USA | 2016 | 250* | map | 745 | 9.3 | First 250 MW commissioned June 2016. Two more 250MW phases proposed. | First Solar, Inc. |
Silver State South Solar Project | USA | 2016 | 250* | map | 711 | 11.7 | Commissioned December 2016 | First Solar, Inc. |
California Valley Solar Ranch | USA | 2013 | 250* | map | 675 | 7.96 | The project is being constructed on 1,966 acres of a 4,365-acre site of former grazing land. | SunPower |
Stateline Solar | USA | 2016 | 250* | map | 658 | 6.82 | The project uses approximately 3.2 million panels from First Solar. | First Solar, Inc. |
Moapa Southern Paiute | USA | 2016 | 250* | map | 629 | 8.1 | First station on north american tribal lands. Commissioned March 2017. | First Solar, Inc. |
El Romero Solar Farm | Chile | 2016 | 246 | map | 493 | 2.8 | Between October 2015 and November 2016, ACCIONA built its biggest photovoltaic plant to date in the Atacama desert. | ACCIONA |
Nikopol Solar Park | Ukraine | 2019 | 246 | map | 4 | Operating since February 16, 2019 | DTEK Renewables | |
Pokrovske Solar Park | Ukraine | 2019 | 240 | map | 4.37 | DTEK estimates that the plant will provide electricity to 200,000 households. | DTEK Renewables | |
Escalante Solar Project | USA | 2016 | 240* | map | 624 | 7.7 | Largest in Utah. | SunEdison, Inc. |
Midway Solar | USA | 2019 | 236 | map | 6.1 | 236MWdc/178MWac. Pecos County, TX | 174 Power Global | |
Blythe Solar Energy Center | USA | 2016 | 235* | map | 622 | 8.1 | Phase 1 of 110 MWAC in Apr 2016. Phase 2 of 125 MWAC in Oct 2016. Up to 485MW when complete. | Solar Trust of America |
Setouchi Kirei Mega Solar Power Plant | Japan | 2018 | 235 | map | 5 | Is the largest solar power station in Japan | Kinkai Salt Field | |
Upton Solar 2 | USA | 2017 | 235 | map | 7.7 | 235MWdc/180MWac with 42MWh storage. Upton County, TX | Vistra Energy | |
Antelope Valley Solar Ranch | USA | 2015 | 230* | map | 614 | 8.5 | Largest in Los Angeles County, CA | First Solar, Inc. |
Roserock Solar | USA | 2016 | 212 | map | 396 | 5.3 | It was the largest solar project in Texas when completed in late 2016. | Recurrent Energy |
Buckthorn Solar 1 | USA | 2018 | 202 | map | 5.1 | 202MWdc/154MWac. Pecos County, TX | NRG | |
Gansu Jintai Solar Facility | China | 2013 | 200 | map | 69 | 1.088 | The project is located in Jinchang City, Gansu Province, People’s Republic of China. | JinkoSolar and Jinchuan Group Co., Ltd. |
Gonghe Industrial Park Phase I | China | 2013 | 200 | map | 20 | Xian de Gonghe, Qinghai | Upstream Huanghe Hydropower Development Co., Ltd. | |
Garland Solar Facility | USA | 2016 | 200* | map | 547 | 8.1 | The Garland solar power project, which produces enough clean electricity to power approximately 50,000 homes. | Recurrent Energy |
Tranquillity Solar project | USA | 2016 | 200* | map | 455 | 7.7 | The Tranquillity project received an Honorable Mention in Renewable Energy World’s 2016 Project of the Year Awards. | Canadian Solar subsidiary Recurrent Energy |
Cixi Solar Farm | China | 2017 | 200 | map | 220 | 14.29 | Spreading across 300 hectares, this is the largest solar power plant installed on top of a fish farm in the country. | Hangzhou Fengling |
Great Valley Solar | USA | 2018 | 200* | map | 675 | 6.5 | A solar project located in Fresno County, California. | Recurrent Energy |
GA Solar 4 Project | USA | 2019 | 200* | map | 8.1 | Largest in Georgia and eastern US. Expected completion December 2019. 261MWdc/200MWac. | First Solar, Inc. |
Solar energy is the fastest growing energy market worldwide, with solar photovoltaic technologies leading the sector. Three fourth of the global renewable energy comes from sunlight. Most countries on the earth are currently generating solar power. With the sector developing so intensively, solar power is likely to soon become the main supplier of electricity demand.
Every nation strives to have the largest solar PV station. Consequently, the number and the list of the top utility-scale PV plants is constantly changing and increasing. China, the United States, and India are the champions in this race due to the enormous number of sunny hours they have yearly. Some African, South American, and Middle Eastern nations, which also receive much solar radiation, are catching up with the leaders.