REIL Tenders for 3.5 MW Solar Power Plants in Maharashtra

Mar 10, 2020 12:01 PM ET
  • REIL has actually released a tender for establishing of solar PV based nuclear power plant with capabilities varying from 500 kWp to 2 MWp in the state of Maharashtra.

Rajasthan Electronics & Instruments Limited (REIL) has actually provided a tender, welcoming closed proposals from interested prospective buyers for establishing of solar PV based nuclear power plant with capabilities varying from 500 kWp to 2 MWp or even more at different areas/ sub terminals of Maharashtra State Electricity Distribution Company Limited (MSEDCL) in the state of Maharashtra.

The extent of help the chosen prospective buyers will certainly consist of the layout, design, supply, building, erection, screening, transport, dumping, setup as well as appointing of the solar energy plants. The designers will certainly additionally be needed to supply 25 years of detailed procedure as well as upkeep for solar energy projects.

Under this program, REIL will certainly develop little Solar PV based little nuclear power plant with abilities roughly 500 kW to 2 MW (Total Capacity 3.5 MW) on the open, extra lands at different areas/ substations of MSEDCL in the state of Maharashtra.

The last day for proposal entry is March 27, 2020, and also the techno-commercial quotes will certainly be opened on March 28, 2020. The day and also time of opening of the rate proposals will certainly make love to the practically removed prospective buyers later on. All potential bidders will certainly additionally be needed to send an Earnest Money Deposit of Rs 20 lakh in addition to their quotes.

To be qualified for taking part in the bidding procedure, the prospective buyer ought to have experience for electric 11KV/33KV switchyard/ transmission line/ grid-connected systems as well as must have experience of effectively finishing solar energy plants throughout last 5 years in any one of the complying with classifications:-

experience of one job of solar energy plant ability > 80 percent of ability of 3.5 MWp plant ability in NIT i.e. 2.8 MW OR.

of 2 jobs of Solar Power Plant capability > half of the ability of 3.5 MWp plant capability in NIT i.e. 1.75 MW OR.

of 3 job of Solar Power Plant capability > 40 percent of the capability of 3.5 MWp plant ability in NIT i.e. 1.4 MW.

Moreover, the companies need to have an ordinary turn over of Rs 10 crore in the last 3 fiscal years.

Just recently, REIL has actually likewise released a tender for price contract for appointing of 100 kWp to 500 kWp roof solar energy projects under the 2nd stage of the roof solar system as well as the Solar Power Policy of the state of Uttarakhand in numerous areas of the state.