  • NTPC Ltd has issued a tender for setting up of 1100 kWp grid-connected solar PV nuclear power plant at North Karanpura in the state of Bihar.

NTPC Ltd has actually provided a tender, welcoming proposals from eligible companies for setting up of 1100 kWp grid-connected solar PV power plant at North Karanpura in the state of Bihar.

The range of benefit the picked designers will consist of the growth i.e design, design, supply, transport, erection, screening, as well as appointing of the solar energy plant, for which the developers will have a period of 6 months (from the date of turning over of the website) to complete the job. Message commissioning, the developers will certainly need to supply thorough operation and also maintenance solutions for the plant for a period of 1 year.

The last day for bid submission is July 29, 2020, and also the techno-commercial bids will be opened on the following day i.e. July 30, 2020. The date and also time of opening of the cost quotes will be informed later on to the practically gotten rid of prospective buyers. All bidders are called for to send an Earnest Money Deposit of Rs 5 lakh along with their quotes.

To be qualified for taking part in the bidding process, the prospective buyers have to have designed, provided, put up/ overseen erection, commissioned/ overseen appointing and also done O&M of solar-based grid plant of at the very least one plant of 100 kWp or above as well as cumulative capability of 880 kWp or over. And the referral plant of 100 kWp or over ability should have remained in effective operation for at the very least six months as on the date of techno-commercial bid opening.

Financially, the typical annual turn over of the Bidder, in the preceding 3 successive fiscal years as on the day of techno-commercial proposal opening, need to not be less than Rs 4.34 crore. And the net worth of the Bidder should not be less than 100 percent of its paid-up share capital as on the last day of the coming before fiscal year.

Under the proven-ness requirements, the prospective buyers should satisfy the list below needs:

  • They must have manufactured as well as provided the solar PV modules of advancing installed capacity of 1 MWp or above making use of any kind of rating of modules as well as any type of source of native or imported PV cells in any one financial year.
  • The prospective buyer should have manufactured and also provided solar PV modules accumulated making use of native and/or imported PV cells of power ranking 240 Wp or over which have to have been in effective operation for at least 6 months as on day of Techno commercial quote opening.