Ameresco to deploy 2.15 GWh of FlexGen energy storage for Southern California Edison portfolio
Dec 8, 2021 12:24 PM ET
- Ameresco has actually picked battery vendor FlexGen Power Systems for a 2,150-MWh energy storage project for Southern California Edison. FlexGen will certainly offer the power storage modern technology together with its HybridOS energy administration system platform.
The power storage space systems will be sited at 3 SCE substations to give on-demand power to boost grid integrity.
The SCE projects, targeted to be completed in Summer 2022, are being released on an aggressive timeline driven by California Gov. Gavin Newsom's emergency pronouncement to bring clean as well as resistant power resources online to guarantee the dependability and adequacy of supply of sources for the California grid.
Also read
- Schneider Finds Rooftop Solar, Batteries Cut System Costs Up to 40%
- FlexGen to Integrate 380-MWh Hybrid Storage at MN8's Mammoth Solar
- METLEN, Tsakos Start Building 251.9-MW Solar-Storage Plant in Greece
- BYD Links Solar, Storage and Robotic FLASH Charging in Abu Dhabi
- Energy Vault Backlog Climbs to $2.3 Billion as Q3 Revenue Falls 61%